![]() ![]() Bill explained: “The airport achieved this certification through a variety of ways, such as converting all airline ground service equipment to electric. ![]() SLCDA also built the new facilities with LEED Gold Certification from the U.S. “The new concourses are designed in a parallel configuration – compared to the current pier layout – which will eliminate aircraft bottlenecks and idling, so airlines are able to get their planes to the gate and back in the air quicker.” “The advantages of building an entirely new airport is that the architects were able to design for the future to create a more efficient and more sustainable facility,” explained Bill. Prior to the pandemic, SLC recorded more than 26 million passengers in 2019, in an airport that was built for only 10 million passengers. The need to build a new SLC Airport became apparent as passenger numbers grew and facilities became outdated. After six years of construction and many more years of planning, we were proud to open the first new U.S. “To say we were excited is an understatement. “The opening day had been years in the making,” said Bill. Six weeks later, Concourse B opened, with 21 gates for the six additional airlines operating out of SLC. Delta Air Lines currently occupies the 25 gates in Concourse A-west, including six international gates. As the lights dimmed on the existing airport, the lights brightened on a new parking garage, gateway center, central terminal and Concourse A-west. On 15 September 2020, the Salt Lake City Department of Airports (SLCDA) turned the key and opened the first phase of The New SLC Airport. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |